ABOUT THE PROJECT

In delivering this major SAGD/CSS project located near Cold Lake, AB, Valard Foundations installed over 14,000 driven piles with pre-drilling. The overall scope of work called for 16 separate pads, and several kilometers of above-ground pipelines, plus the expansion of the Central Facility. This work was released over several years and included multiple phases. We faced substantial schedule changes and accommodated the accelerated timing by increasing the number of units & crew working. At times Valard Foundations had 4 piling units & 12 crew members working together on individual pads. Additional services rendered include but are not limited to:

  • Material hauling & logistics;
  • Engineering + Survey services & As-builts;
  • Pile installations;
  • Splicing & welding;
  • QA/QC; and
  • Site safety.